Rigging, Spars, Winches & Ground Tackle
Oversized 1 X 19 stainless steel standing rigging replaced in 2008; inspected in 2012
Keel-stepped Isomat aluminum mast and matching Isomat boom
Self-tending staysail boom
Two adjustable intermediate stays
Schaeffer traveler blocks and lines (2011)
Masthead sheaves and masthead light replaced in 2008
Hella deck and steaming light replaced in 2008
Harken jib furler
Two Barient 27 two speed self-tailing winches on coaming, one Barient 17 winch on port cabin deck, and Three Barient 12 two speed winches winches on mast
Muir 1250 vertical, electric anchor windlass with up/down foot switches; motor rebuilt and new gearbox installed in 2012
One 35# CQR anchor with 250’ BBB chain (primary anchor)
One 33# Bruce anchor with 20’ BBB chain and 250’ of nylon braid rode (secondary anchor)
Raw water wash-down pump in anchor locker with outlet near windlass (2012); hose and sprayer included
Keel-stepped Isomat aluminum mast and matching Isomat boom
Self-tending staysail boom
Two adjustable intermediate stays
Schaeffer traveler blocks and lines (2011)
Masthead sheaves and masthead light replaced in 2008
Hella deck and steaming light replaced in 2008
Harken jib furler
Two Barient 27 two speed self-tailing winches on coaming, one Barient 17 winch on port cabin deck, and Three Barient 12 two speed winches winches on mast
Muir 1250 vertical, electric anchor windlass with up/down foot switches; motor rebuilt and new gearbox installed in 2012
One 35# CQR anchor with 250’ BBB chain (primary anchor)
One 33# Bruce anchor with 20’ BBB chain and 250’ of nylon braid rode (secondary anchor)
Raw water wash-down pump in anchor locker with outlet near windlass (2012); hose and sprayer included